Refurbishment and building specialist

t: 01344 393 030

“PiLON’s operatives were very good indeed. They worked hard and finished the job on time and to the specification. The job demanded a very tightly controlled schedule, and we chose PiLON as our subcontractor because they offered the best value, listened to any issues, and showed a high standard of workmanship. They also paid great attention to health and safety regulations.”

Adam Elder, contract manager, Balfour Beatty.

Project Blackstock Estate, Islington, London, N4
Client Balfour Beatty
Ultimate Client Homes for Islington
Value £400,000
Period 9 months

Click to enlarge:

Decent Homes - kitchen and bathroom works

Scope of works:
PiLON’s contract was to replace kitchens and bathrooms in 100 occupied and tenanted properties, and in so doing to bring them up to government’s Decent Homes standard.

The kitchens were over 30 years old, and many of the bathrooms 40, which meant that all of the units and bathroom suites needed to be removed. As the homes remained occupied throughout, the toilets were always replaced on the same day, and even though proper cooking facilities were temporarily affected, a hot and cold water supply was always left to a temporary kitchen sink unit at the end of each day.

Select another case study

© Copyright 2012 PiLON. Head Office: Atrium Court, The Ring, Bracknell, Berkshire, RG12 1BW